Hybrid Thermal System (HTS)
Skip to content
  • HOME
  • ABOUT
  • HOW IT WORKS
  • CASE STUDIES
  • RESOURCES
  • INVESTOR RELATIONS
  • GALLERY
    • PHOTO GALLERY
    • VIDEOS
  • FAQs
  • CONTACT US
+ (123) 1800-567-8990
Mon - Fri: 9:00 - 19:00 / Closed on Weekends
[email protected]
  • Contacts

Gallery

Adani HQ1 Ahmedabad
Adani HQ2 Ahmedabad
APMC, Navi Mumbai 1
Asvini hospital, Mumbai 2
Asvini hospital, Mumbai 3
Asvini hospital, Mumbai 4
Asvini hospital, Mumbai
Buldana Hospital, Maharashtra
Hawaii, USA
Mantralaya Mumbai 2
Mantralaya Mumbai
Mc Donalds Kalamboli 2, Mumbai
Mc Donalds Kalamboli, Mumbai
Mental Hospital, Pune 2
Mental Hospital, Pune
Saigon, Indonesia
Standard Chartered Bank - South Bombay
Honda Manesar Plant
Mahindra Chakan 1
Mahindra chakan 2
Strongbuilt-AZ
Vidhan Sabha Raipur
Standard Chartered Bank - South Bombay
Saigon, Indinesia
Rajasthan Secretariat 2
Rajasthan Secretariat 1
P_G Mandideep, Bhopal
P_G Mandideep 3
NTPC Naya Raipur 2
NTPC Naya Raipur 1
Nivea Factory Gujarat
Mental Hospital, Pune
Mental Hospital, Pune 2
Mc Donalds Kalamboli, Mumbai
Mc Donalds Kalamboli 2, Mumbai
Mazgaon metropolitan court 2
Mazgaon metropolitan court 1
Mantralaya Mumbai
Mantralaya Mumbai 2
Mahindra chakan 3
Mahindra chakan 2
Mahindra Chakan 1
Honda Manesar Plant
Hero Factory
Hawaii, USA
close up view
Buldana Hospital, Maharashtra
Bikanerwala Delhi
Asvini hospital, Mumbai
Asvini hospital, Mumbai 4
Asvini hospital, Mumbai 3
Asvini hospital, Mumbai 2
APMC, Navi Mumbai 1
Adani HQ2 Ahmedabad
Adani HQ1 Ahmedabad

Categories

  • No categories

Need Help?

Get In Touch With Us

Perfect Infraengineers Ltd.

R-637, TTC Industrial Area, MIDC, T.B. Road, Rabale, Navi Mumbai, Thane MH 400701

CIN No. L29190MH1996PLC099583
Ph.: +91 9870033483
Email: [email protected]

Changing the way India cools..

© 2021 Hybrid Thermal System (HTS) by Perfect Infra


 

Loading Comments...